Project: Greasley Beauvale Primary School, Nottinghamshire
Application: Internal school balustrade refurbishment
System: Modified Balconette Aerofoil Infinity balustrade
Finish: Royal Chrome
Approximate length: 70 linear metres
Design: Approximately 80% standard system components, with project-specific adaptations
Installation: Two weeks, during the school holidays
The challenge: making existing school guarding more difficult to climb
The original balustradeSelect an image to enlarge
When Greasley Beauvale Primary School reviewed the safety of its existing internal balustrades, the concern was not simply their age or appearance. It was how children could interact with the design.
The original installation comprised metal framing, glass infill panels and handrails. Gaps and projecting elements within the arrangement provided potential handholds and footholds, creating opportunities for children to climb.
Following a revised risk assessment, the school wanted a taller, smoother guarding arrangement that would make climbing more difficult.
Replacing the entire installation, however, would have introduced a second problem.
The existing balustrade posts were cantilevered from structural steelwork within the building. Their connections extended through finished plasterwork, meaning that removing them would have required significant opening-up and associated remedial work.
The project therefore called for a solution that could improve the guarding arrangement while retaining as much of the existing supporting structure as practicable.
Retaining the existing posts
The initial design discussions involved Balconette and the project architect, who explored whether the existing installation could be modified rather than completely replaced.
This approach also formed part of the project's consideration of the approvals and scope of work required.
The key technical challenge was determining whether the existing structural posts could support a new, taller guarding arrangement.
Retaining the posts avoided unnecessary removal of their concealed structural connections, but their capacity could not simply be assumed.
Balconette engaged a structural engineer to assess both the existing arrangement and the proposed modifications.
The engineer undertook structural calculations covering the retained supports and the new guarding design.
This allowed the team to develop a solution based on the existing load path rather than introducing an entirely new fixing arrangement.
The structural assessment informed the final connection details and the proposed guarding arrangement.
This distinction was important: the design did not depend on the assumption that the original installation was defective or structurally inadequate. The issue was that its geometry no longer met the school's revised safeguarding objectives.
A taller, smoother guarding arrangement
The school wanted to reduce opportunities for climbing by removing accessible footholds and handholds and increasing the effective height of the barrier.
The objective was not simply to add height to the existing handrail.
The replacement design needed to create a substantially smoother surface while remaining compatible with the retained structural posts.
A modified Aerofoil Infinity system was developed, using approximately 80% standard components alongside custom-designed elements.
The bespoke elements allowed the new system to be integrated with the existing supports and accommodate the project's particular geometry.
The Royal Chrome finish provided a consistent appearance across the completed installation.
By adapting an established system rather than designing every component from scratch, the team could address the unusual site conditions while retaining a largely standardised construction approach.
The finished design was intended to reduce opportunities for climbing, rather than claim to eliminate them entirely.
Engineering the interface between old and new
Design conceptsSelect an image to enlarge
The most important technical aspect of the project was the connection between the retained posts and the modified balustrade.
The original cantilevered supports transferred loads back to the building's structural steelwork.
Increasing the height of the guarding potentially changes the bending moments and other forces acting on the supports and their connections.
For that reason, the new arrangement required assessment as a complete system.
The structural engineer considered the existing supporting elements alongside the proposed guarding geometry and connection details.
The design also needed to account for the arrangement of the approximately 70-metre balustrade run, including intermediate and end posts.
The system was developed around post-to-post connections, avoiding the need for additional wall fixings at the ends of the runs.
That was particularly useful in an existing building where unnecessary intervention into finished walls or concealed construction would have increased the scope of remedial work.
The completed design was therefore not simply a taller balustrade attached to an old installation.
It was an engineered modification in which the existing structural supports and new guarding components were assessed together.
Delivering the works within the school holidays
The installation had to be completed within a defined school holiday window.
Balconette's installation team worked on site for two separate one-week periods, completing the works within the planned two-week programme.
The logistics required careful preparation.
Because the team was working away from its normal base, materials needed to arrive together in a coordinated delivery.
The site was prepared with full scaffolding and floor protection before the installation team began work.
This allowed the installers to concentrate on the balustrade works rather than losing time arranging access and protection.
The programme also reduced the need to undertake intrusive guarding works while pupils were present.
The combination of advance engineering, prefabricated components and site preparation was important to achieving the installation deadline.
The completed solution
The completed installationSelect an image to enlarge
The project delivered approximately 70 linear metres of modified Aerofoil Infinity balustrade in Royal Chrome.
The new arrangement provided a taller, smoother barrier intended to reduce climbing opportunities, while retaining the existing structural posts.
The approach avoided extensive removal of the original concealed supports and the associated opening-up and remedial works that would otherwise have been required.
It also demonstrated how an established balustrade system could be adapted for a school refurbishment where the existing structure imposed significant constraints.
The outcome was a project-specific solution supported by structural engineering calculations and delivered within the school's planned holiday period.
Why the project matters
School guarding refurbishment is rarely just a question of selecting a new balustrade.
Existing structural connections may be concealed within walls or floors. Changes in guarding height can alter structural demands. Safeguarding requirements may differ from those considered when the original installation was designed.
At Greasley Beauvale, the project team addressed these issues together.
Rather than removing the existing installation indiscriminately, the team investigated what could be retained, assessed the structural implications and developed a modified system around the school's requirements.
The project illustrates the value of combining a risk-led brief, engineering assessment and adaptable product design before committing to extensive replacement work.
For schools and estates teams facing similar challenges, the central lesson is that an existing balustrade can sometimes be substantially improved without removing every element of its supporting structure - provided the retained components and new design are properly assessed together.
Project specification
| Item | Detail |
|---|---|
| Project | Greasley Beauvale Primary School |
| Location | Nottinghamshire |
| Application | Internal school guarding |
| System | Modified Aerofoil Infinity |
| Finish | Royal Chrome |
| Length | Approximately 70 linear metres |
| Existing structure | Retained cantilevered posts connected to structural steelwork |
| Design approach | Approximately 80% standard components, with custom elements |
| Structural assessment | Existing supports and proposed arrangement assessed by an appointed structural engineer |
| Installation | Two weeks during school holidays |








